• <menu id="ua0p1"><rp id="ua0p1"></rp></menu>

        1. <optgroup id="ua0p1"><em id="ua0p1"><pre id="ua0p1"></pre></em></optgroup>
          <menu id="ua0p1"><rp id="ua0p1"></rp></menu>

        2. <acronym id="ua0p1"></acronym>
        3. <ol id="ua0p1"><center id="ua0p1"></center></ol>
        4. <menu id="ua0p1"></menu>

          Renewable Energy Systems Ltd

          Renewable Energy Systems (RES), a wind energy company, built a Vestas V29-225kW wind turbine at their head office in September 2003.
          RES turbine at Kings Langley

          Renewable Energy Systems (RES), a wind energy company, built a Vestas V29-225kW wind turbine at their head office in September 2003, at Kings Langley, Hertfordshire - the first wind turbine visible from the M25.

          The turbine, with a hub height of 36 metres and a rotor diameter of 29 metres, works alongside other renewable energy technologies that can provide all the heat, power and cooling needed for their environmentally-friendly offices and sends excess electricity to the grid.

          A website dedicated to the company headquarters, presents data on the wind turbine’s daily electricity production since 01 November 2003.

          无码任你躁国语版视频,婷婷色婷婷开心五月四房播播,激情偷